Power Industries

When a power plant is not in operation, many components within the plant are subject to corrosion. This is referred to as standby corrosion. A plant may be shut down due to planned or unplanned maintenance, or due to low seasonal power demand. Power plants have to be idled or shut down temporarily due to following reasons:

  Maintenance or repair
  In case of breakdown
  Partial shut down due to excess capacity
  Extended cold standby (ECS)

Power plants have expensive auxiliary equipment that is subject to damage if measures are not taken to maintain relative humidity and prevent it from moisture which causes corrosion. As a rule of thumb, it is best to maintain relative humidity levels at or below 35% RH to slow down the rate of corrosion.

Application

Industrial Project Solution

 Humidity contro lduring maintenance jobs of generators & transformers
  Humidity and temperature control in main cooling water pipeline during maintenance jobs
 
Ventilation service during overhauling of GI ducts or stator well
 
Preservationof critical equipment like turbines, boilers, transformers, generators, condensers, etc
 
Drying of pipelines after hydrotesting to remove moisture
 
Humidity control during Box up of stator winding
 
Humidity control during Rubber Lining of acid tanks

Surface Preparation and Coating

 Humidity and ventilation control during blasting, coating and maintenance jobs in penstock (Hydro power plant)
 Humidity and temperature control in absorbers tanks and ducts during glass flake coating and rubber lining jobs in FGD.
 Humidity control during borosilicate lining & glass flake coating inside chimney stack
 Humidity control in spiral casing during blasting and coatingjobs
 Ventilation and temperature control during alumia blasting of rotors

Safe Confined Area Access

 Comfortable working conditionsinside confined areas like pipelines, DM Water tanks, tanks, boiler, drum, economizer,
   condenser water box, cooling water duct, etc.
 Humidity and ventilation service for faster cooling of ESP area to enable the worker to do maintenance jobs
 Ventilation and temperature control inside chimneys during chimney stack